COMMERCIAL ARTIFICIAL TREES & LANDSCAPE SOLUTIONS
Statement-scale botanical forms

Feature Trees

Focal trees developed for atriums, hospitality spaces, retail environments, themed projects and custom architectural installations.

Commercial interior greenery

Interior Trees

Potted and fabricated botanical forms for hotels, offices, retail spaces, restaurants, showrooms and other commercial interiors.

Palm tree solutions

Outdoor Palm Trees

Choose between outdoor artificial palm trees for commercial exterior projects and preserved palm trees for interior applications.

Integrated greenery systems

Green Walls & Vertical Gardens

Modular and project-built greenery systems for commercial walls, ceilings, screening, landscape edges and branded feature areas.

Structured landscape forms

Topiary & Shrubs

Sculpted greenery for entrances, pathways, hospitality landscapes, retail displays and repeatable commercial schemes.

Botanical components and florals

Artificial Flowers & Foliage

Commercial-grade branches and decorative florals for tree building, arrangements, seasonal programs and project installations.

Project-specific built environments

Specialised Project Products

Project products for themed environments, hospitality, attractions, commercial landscapes and infrastructure applications.

Outdoor artificial palm tree installation for a commercial landscape project

Commercial artificial greenery installation

Installation guides

Practical guidance for preparing, fixing and assembling large artificial trees, outdoor artificial palms and artificial green walls for commercial projects.

01Before you begin

Prepare the site with confidence

Six checks before your artificial greenery arrives

Early confirmation of access, dimensions, surfaces and equipment helps commercial artificial tree and plant installation proceed safely and efficiently.

01 / ACCESS

Site access

Check doors, lifts, stairs, loading routes and any lifting restrictions before dispatch.

02 / SPACE

Final dimensions

Confirm ceiling height, clearances, canopy width and the final installation zone.

03 / SURFACE

Surface condition

Review the floor, wall, planter or foundation that will receive the installation.

04 / FIXING

Fixing method

Confirm the base, anchor, wall fixing or other project-specific connection method.

05 / ASSEMBLY

Working space

Allow room for trunk lifting, branch fitting, canopy opening and final shaping.

06 / EQUIPMENT

Labour & equipment

Arrange qualified installers and suitable access, lifting and fixing equipment.

02Product systems

Installation guides by product system

Start with the greenery system specified for your project

Each route brings together the relevant site preparation, fixing method, assembly sequence and final inspection considerations.

Large artificial tree branch assembly during commercial installation
01 / TREESASSEMBLY GUIDE

Large artificial trees

Guidance for base positioning, modular trunk and branch assembly, component identification, canopy shaping and final stability checks.

Covers: delivery, base fixing, branch assembly and final shaping

Ask about tree installation ↗
Outdoor artificial palm tree trunk lifting and positioning
02 / OUTDOOR PALMSCOMPLETE PROCESS

Outdoor artificial palms

Follow the complete sequence from site positioning and foundation preparation to trunk lifting, base fixing and frond assembly.

Covers: foundation, anchoring, lifting, fronds and inspection

View palm installation process ↓
Artificial green wall panel installation for a commercial interior
03 / GREEN WALLSINSTALLATION GUIDE

Artificial green walls

Surface assessment, panel layout, trimming, mechanical fixing, edge finishing and final foliage adjustment.

Covers: layout, cutting, fixing, finishing and coverage

Ask about green wall installation ↗
03Installation process

Complete outdoor artificial palm tree installation

From foundation preparation to the finished canopy

This field sequence shows the principal stages used to coordinate a large outdoor artificial palm tree installation. Final foundation and fixing requirements remain specific to the tree configuration and site conditions.

STEP 01

Site review & positioning

Confirm the position, access route, working area, lifting clearance and foundation location before site work begins.

Artificial palm tree installation site review and positioning
STEP 02

Foundation & base preparation

Prepare the reinforced concrete foundation, embedded anchors and base plate interface according to the approved project details.

Artificial palm tree reinforced foundation and base plate preparation
STEP 03

Components prepared on site

Unpack, inspect and organise the palm components. Keep fronds and connection parts protected and easy to identify.

Artificial palm fronds organised for on-site installation
STEP 04

Trunk lifting & positioning

Lift the trunk with suitable equipment, guide it into position and align the steel base plate with the embedded anchors.

Artificial palm tree trunk lifted and positioned over the foundation
STEP 05

Base plate fixing & alignment

Position the base plate, install washers and nuts, check trunk verticality and complete the specified tightening sequence.

Artificial palm tree base plate being fixed to the foundationAnchor bolts securing an artificial palm tree base plate
STEP 06

High-level installation access

Use suitable access equipment to reach the crown and complete high-level component installation under the site contractor’s approved working procedure.

High-level access equipment used during artificial palm tree installation
STEP 07

Final inspection

Review the finished canopy, trunk alignment, visible connections and installation area before handover.

Outdoor artificial palm trees installed on site after final inspection
04Structural coordination

How the structural system works

How the structural connection is coordinated

For applicable palm configurations, the trunk structure, connection, base plate, anchors and foundation are coordinated as one fixing system. Final requirements depend on the selected product, site conditions and local engineering review.

Request structural information ↗
01 / STEEL TRUNK

Load transfer

Where used, the internal steel structure transfers loads through the connection system.

02 / CONNECTION

Welded interface

The specified connection links the trunk structure to the base plate.

03 / BASE PLATE

Force distribution

The steel plate transfers forces across the anchor arrangement.

04 / ANCHORS

Mechanical fixing

Anchor bolts, washers and nuts secure and align the assembly.

05 / FOUNDATION

Reinforced support

Foundation requirements are determined for the selected configuration and site.

06 / SITE REVIEW

Local verification

Final requirements must be checked for the installation site.

05Technical resources

Palm tree installation resources

Use the right information for each project stage

Start with the general procedure, then use the structural instructions and base drawings for detailed coordination.

01 / INSTALLATION PROCEDURE

Installation procedure

A practical overview of foundation preparation, trunk positioning and palm foliage assembly.

Open installation procedure ↗
02 / STRUCTURAL INSTRUCTIONS

Structural connection guide

An explanation of load transfer, welded connections, base plates, anchors and reinforced foundations.

Open structural instructions ↗
03 / BASE PLATE DRAWINGS

Base & foundation drawings

Base plate, anchor bolt and foundation information for artificial palm tree installation.

Open base plate drawings ↗

Installation questions

What project teams ask before installation

Answers may vary by product size, structure, fixing method and site conditions.

01Does Oakco provide installation support?+

Oakco can provide remote guidance and, for selected projects, on-site support by arrangement.

02Are installation drawings available?+

Available drawings depend on the product and project scope. Submit the selected model and site information for review.

03How are large artificial trees delivered?+

Large trees may be supplied in protected, labelled sections where the product configuration requires on-site assembly.

04Can the base plate be customised?+

Base dimensions, fixing positions and concealment requirements can be reviewed for applicable custom projects.

05What site information is required?+

Plans, final dimensions, access routes, ground or substrate details, exposure conditions and lifting restrictions are useful.

06Who approves the final structural fixing?+

The appointed contractor or qualified local professional is responsible for final foundation, structural and fixing approval.

Start with your site information

Need installation guidance for your selected product?

Share the selected product, site dimensions, installation surface and project location. We’ll help identify the relevant installation information.

Ask For A Quick Quote

We will forward the letter to your email, if you have not received the email please contact sales@oakco.com